France looks to speed up wind power projects

France will announce steps this week to accelerate the installation of wind turbines. To date, only half of the authorized French onshore wind projects have been installed due to legal opposition from activists. 

|
Stephane Mahe/Reuters/File
This wind turbine is part of the Landes de Couesme wind farm near La Gacilly in western France. French activists have successfully lobbied against scores of onshore wind turbine projects since 2004.

France is expected to announce measures this week to accelerate the installation of wind turbines and overcome long-running opposition from activists who have frustrated the country's attempts to hit renewable energy targets.

A working group formed in October to make approvals easier has finalized plans that include removing one legal avenue for blocking projects and paying a portion of wind farm taxes directly to affected communities, an industry official said.

French onshore wind projects delivering 22 gigawatts have been authorized, but only 12.9 GW has been installed because of legal challenges, according to official data, leaving France struggling to meet its target of producing 26 GW by 2023.

Industry officials say it can take over a decade to get French wind farm projects up and running because of systematic legal objections by opponents whereas in Germany, Europe's biggest wind power producer, it can be as short as three years.

Marion Lettry, deputy head of the French renewable energy lobby Syndicat des Energies Renouvelables (SER) and part of the working group, said administrative tribunals were set to be removed from the legal options open to those campaigning against wind farms in France.

"This will not automatically reduce systematic appeals against projects, but will hopefully accelerate the process and thereby cut by at least two years off the time it takes for projects to be connected to the grid," she told Reuters.

A spokesman for the Ministry of Ecology declined to comment on specific measures, saying the conclusions would be announced on Thursday. The government has said previously it would adopt the working group's proposals as soon as possible.

France had been hoping growth in renewable energy sources such as wind, solar, and hydro power would reduce its dependence on nuclear energy to 50 percent of its electricity needs by 2025 from more than 75 percent now.

But the government postponed that deadline in November after grid operator RTE warned that without a massive increase in renewables the country risked power shortages.

Almost all the wind turbines in France have been installed by companies from other European countries, according to data from industry lobby group France Energie Eolienne (FEE).

Denmark's Vestas Wind Systems has installed the most followed by German companies Enercon, Senvion, and Nordex and then German-Spanish firm Siemens Gamesa Renewable Energy.

'Guerrilla campaign'

The origin of the countrywide campaign against French wind farms dates back to 2004 when retired physicist Jean-Louis Butre attended a public hearing on a planned project near his house in the Poitou region of western France.

"It was supposed to be one turbine. But they lied. It was six," he told Reuters in a phone interview, saying the promoters glossed over concerns raised by residents.

Mr. Butre formed an association to fight back and the project was abandoned some years later. His success spawned associations in villages and towns that coalesced into the Federation Environment Durable (FED) with more than 1,000 local groups.

"In principle we are against all wind projects. We are a sort of guerrilla campaign against a financially powerful wind lobby and companies," Butre said.

Using how-to kits with step-by-step guides on starting legal procedures against projects, from inception through the approval phases in councils and courts, FED members launch appeal after appeal against wind projects.

The activists have scored notable wins. They have blocked wind farms near historic sites such as Mont Saint Michel in Normandy and energy company Engie was forced to abandon a project near a World War I battlefield in November.

"The filing of appeal after appeal against projects has become a French pastime," said Gwenaelle Huet, renewables energy director at Engie, the biggest wind power producer in France.

"This does not provide visibility to investors and it is made worse by the increasing number of abusive appeals," she said, adding that some were filed on technicalities which stalled projects even without prolonged hearings.

Ms. Huet said it can take six to eight years – and sometimes more than a decade – for wind projects to come online in France compared with three to four years in Germany.

The administrative tribunals targeted by the working group are usually the first place a legal appeal is filed and it can take two years to hear a case. If that fails, campaigners can go to the Court of Appeal which can take another two years.

If one side is still not satisfied the case can go to the highest administrative court, the Council of State. Once it has heard the case it would go back to the appeals court for a final decision, adding several more years to the process.

Blinking beacons

One of the key challenges for the wind power industry is how to soften local community objections to wind projects and get early buy-in from residents.

Mr. Lettry at SER said another proposal set to be announced by the government this week would be for 20 percent of a business tax (IFER) on wind farms to go directly to communities where turbines have been built.

Lettry said, however, that a proposal to make blinking warning beacons on the top of turbines constant was still under consideration.

"The blinking red lights are annoying to many. It is one of the reasons that is systematically mentioned as a nuisance in appeals," Engie's Huet said.

Germany has more than 45 GW of capacity. A spokesman for the German Wind Energy Association (BWE) said communities affected by projects were consulted early in the process and it took three to five years to get wind farms up and running.

Spain is also ahead of France with 23 GW of capacity. A spokeswoman for the Spanish Wind Energy Association (AEE) said the main reason for project delays was red tape, not activists.

Campaigners in Britain have successfully prevented scores of onshore projects being approved by local authorities. Like France, Britain has 12 GW of onshore wind power but it has 6 GW of offshore farms and is now focusing on large projects at sea.

This story was reported by Reuters. 

You've read  of  free articles. Subscribe to continue.
Real news can be honest, hopeful, credible, constructive.
What is the Monitor difference? Tackling the tough headlines – with humanity. Listening to sources – with respect. Seeing the story that others are missing by reporting what so often gets overlooked: the values that connect us. That’s Monitor reporting – news that changes how you see the world.

Dear Reader,

About a year ago, I happened upon this statement about the Monitor in the Harvard Business Review – under the charming heading of “do things that don’t interest you”:

“Many things that end up” being meaningful, writes social scientist Joseph Grenny, “have come from conference workshops, articles, or online videos that began as a chore and ended with an insight. My work in Kenya, for example, was heavily influenced by a Christian Science Monitor article I had forced myself to read 10 years earlier. Sometimes, we call things ‘boring’ simply because they lie outside the box we are currently in.”

If you were to come up with a punchline to a joke about the Monitor, that would probably be it. We’re seen as being global, fair, insightful, and perhaps a bit too earnest. We’re the bran muffin of journalism.

But you know what? We change lives. And I’m going to argue that we change lives precisely because we force open that too-small box that most human beings think they live in.

The Monitor is a peculiar little publication that’s hard for the world to figure out. We’re run by a church, but we’re not only for church members and we’re not about converting people. We’re known as being fair even as the world becomes as polarized as at any time since the newspaper’s founding in 1908.

We have a mission beyond circulation, we want to bridge divides. We’re about kicking down the door of thought everywhere and saying, “You are bigger and more capable than you realize. And we can prove it.”

If you’re looking for bran muffin journalism, you can subscribe to the Monitor for $15. You’ll get the Monitor Weekly magazine, the Monitor Daily email, and unlimited access to CSMonitor.com.

QR Code to France looks to speed up wind power projects
Read this article in
https://www.csmonitor.com/Environment/Energy/2018/0117/France-looks-to-speed-up-wind-power-projects
QR Code to Subscription page
Start your subscription today
https://www.csmonitor.com/subscribe